Wednesday 11 July 2012

New House Build

Hello,

Across the road they are building 3 new houses, they demolished the old house there, you can see this in my previous blog, the land cost 60,000,000 yen, the piling work cost 4,000,000 yen, all expensive stuff in Tokyo.

The piles drilled down 6m at a diameter of 400mm, the hole was then filled with concrete and a 6 meter steel tube pushed down the center. Why I find this interesting is after the quakes in Christchurch the DBH propose foundation work, I have never seen it done before but it sure is expensive work!

Check out the amount of reinforcing bar that goes into a house foundation here!

Check out the photos.

Drilling machine on the right

The bags on the left are cement

The ground here is very wet, some stuff that came out the hole

The cement went into a hopper and mixed and fed to the drilling machine


Give an idea how high the drilling machine is

This is what 4,000,000 yen worth of piling work looks like $65,000NZD


Digging out the foundation

Add caption



Steel boxing going in

Reinforcing going down


Check out the amount of reinforcing


Close up of reinforcing






All 3 concrete slabs finished